Blackfriars Bridge works near completion

Work on the new pedestrian and cycle facility across Blackfriars Bridge is nearing completion. The much improved design is the fruit of more than 2 years lobbying by LCC and City Cyclists. The design creates a wider (2m) cycle lane on the left side of the carriageway.

Post a reply

Sign in to post a reply.