Local groups win Cycle Hire improvements

LCC borough groups in Zone 1 have influenced the Cycle Hire 'complementary measures', designed to augment the scheme launching on 30 July 2010.

A map of the measures can be downloaded on the right.

A map of docking station locations can be found here (although some locations might have changed since it was published).

LCC has been lobbying extensively for a Zone 1 BikeGrid, a proper network of cycle lanes spanning central London in a north-south and east-west criss-cross manner.

 

Post a reply

Sign in to post a reply.